The Kazakh-British Technical University's Drilling Training and Simulation Center - KBTU Drilling Center - is currently training future oil engineers of SEPI
|
|
|
|
State of the classroom fund
|
|
|
Administration |
Training class |
Training class |
|
|
|
Conference hall |
Training class |
DrillSim-5000 |
|
||
DrillSIM-20 |
Well Operations Polygon
The technological process begins with four production wells, which separately simulate oil production processes using different operating methods and with one injection well for reservoir pressure maintenance;
The pressure will be provided by the pump system (up to 10 bar), the working agent is a water;
The test site equipment is equipped with automatic sensors and synchronized with a computer lab.
The test site equipment is equipped with automatic sensors and synchronized with the Smart Field Airankol computer laboratory located at KBTU.
The system implements various algorithms that simulate the operation of a real technological process;
status of control stations of Electric centrifugal pump, Sucker rod pump and Pumpjack;
pressure sensor status;
temperature sensor status;
level sensor status;
well management;
pump control;
organization of data transfer to KBTU JSC (audience of Caspian Neft JSC).
|
|
|
|
|
|